Requesting information

Every week on site there's a question waiting on an answer — a detail, a drawing, an approval — and the team can't move until it arrives. Nobody tracks what's still waiting or who owes it, so "still coming" slips from days into weeks, and the delay becomes yours.

What YPA does

Why information is the slowest thing on site

Concrete and steel move on trucks. Information moves in people's inboxes. That's why the flow of information is where delays are born — a question asked on Monday, answered two weeks later, and the team stood for three days in between.

The contractor's problem isn't usually getting the answer. It's knowing what's still waiting, who owes it, and when it became overdue. Without a list, every answer is "still coming."

An RFI is your paper trail

An RFI (Request for Information) is a written question to the consultant, engineer or client — and it's your protection:

An oral "I asked him" is not a claim. A dated RFI with no response is.

What a YPA sheet looks like

Every request for information goes onto the YPA RFI Register — one row per item, dated, with an owner and a required-by date. This is the actual sheet format YPA generates (filled with example rows):

YPA
YPA — Your Project Assistant · RFI Register Example project · generated sheet format
RFI NoDate RaisedDisciplineDrawing/Spec RefQuestionRaised ByRequired ByResponseResponse DateStatusBlocksVerified BySource Tag
RFI-1062026-06-28ArchitecturalA-104 Rev BWindow sill level - Block ASite Agent2026-07-05Sill at 900mm2026-07-04AnsweredManual
RFI-1072026-07-02StructuralS-202 Rev ALintel bearing detail - Block ASite Agent2026-07-09Use 150mm bearing2026-07-08AnsweredManual
RFI-1082026-07-08ElectricalE-310 Rev CCable tray route - plant roomSite Agent2026-07-15Route per mark-up2026-07-14AnsweredManual
RFI-1092026-07-14ArchitecturalA-110 Rev BStone cladding joint detailSite Agent2026-07-21Use 15mm open joint2026-07-20AnsweredManual
RFI-1102026-07-18MechanicalM-208 Rev BAHU location - roofSite Agent2026-07-25As per layout2026-07-24AnsweredManual
RFI-1112026-07-24CivilC-112 Rev AStormwater outlet invertSite Agent2026-07-31OpenBlock B storm lineManual
RFI-1122026-07-28StructuralS-204 Rev CSlab edge detail - Block BSite Agent2026-08-04OpenSlab pour Block BManual
RFI-1132026-08-01ElectricalE-312 Rev ASwitchgear feeder sizingSite Agent2026-08-08OpenMain DB energiseManual
RFI-1142026-08-05ArchitecturalA-118 Rev BBalustrade fixing detailSite Agent2026-08-12OpenStair A handoverManual
RFI-1152026-08-08MechanicalM-212 Rev ADuct penetration - fire wallSite Agent2026-08-15OpenFire wall closureManual
5 open · 5 answeredYPA flags open rows past their required-by date →
Example only — illustrative rows in the real YPA RFI Register sheet format (one row per request, dated, owned, status-tracked).

What to do about it

Want the full picture?

We've built YPA for the way African construction projects actually work. YPA is the site file with a memory. YPA is onboarding its first live builds in small, limited cohorts. Pilot places are free for a defined period — and if we ever charge, the plan and its price will be shown to you before anything is billed.