Notices & deadlines
Many disputes aren't lost on the merits — they're lost on notice: the clause that required written notice within a set number of days, the problem raised on a call instead, the window gone by the time it mattered. A missed window is a lost right, and the windows often pass unwatched.
What YPA does
- Reads notices out of your WhatsApp, emails, letters and meetings — both directions — and files each as a dated row on the Notices Register: when it was issued, who it's to or from, the action it requires, and the deadline that action must happen by. Photograph a letter, forward an email, send a WhatsApp — YPA dates it the day it arrives. Nothing lives in memory.
- Computes every window from the dates — issue date plus the days your contract allows — so each row shows the deadline and how many days are left, without anyone doing the counting.
- Watches the response clocks and puts anything closing in your morning brief — on WhatsApp or email — an incoming notice that needs an answer inside a window, an outgoing notice that needs a follow-up — before the window closes, not after the right is lost.
- Drafts the notice and the follow-up — the wording when you first know a delay is coming, the chaser when a window is running out. A formal notice comes to your email as an attachment to open, check and send on yourself; a short chaser arrives on WhatsApp. Ask for either in either channel. YPA keeps the dates; your contract keeps the meaning — the register never advises on what your contract requires.
- Links each notice to its evidence and its story — the email, letter, WhatsApp or minutes, and the variation or RFI it belongs to — so the record runs end to end: the event, the notice, the window, the response.
- Files every notice in your project folder and answers on demand — ask "which windows are closing this week?" or "send me the default notice from August" any time, on WhatsApp or email, and YPA answers from the register and sends the document to the channel you name.
Every notice and follow-up YPA drafts comes to you for review first. Nothing goes out until you send it yourself.
How it actually runs
- Standard contracts tie rights to events: if you don't notify within the stated period — a delay, a stoppage, an instruction, a default — you can lose the extension, the cost, or the claim, even when the cause was someone else's.
- Notices run two ways. Outgoing: what you must send to protect your position. Incoming: what arrives with a response window, where silence counts against you.
- Each notice carries a date, a deadline and a required action. Between them sit the windows — the calendar days your contract allows to notify, respond, or both.
- If the notice is written, dated and provable, the right survives. If it was said on a call and never put on paper, it doesn't.
Where it usually goes wrong
The expensive failure is never the deliberate one:
- The incoming notice that sat in the inbox — arrived on a Friday, its window ran out while nobody was looking.
- The outgoing notice that should have been sent earlier — sent three weeks after the delay was known, not on the day it first became apparent.
- The call that should have been a notice — the problem was raised, but not in writing, so the window opened and closed with no record.
- The deadline nobody wrote down — the extension request, the adjudication response, the reply that had to land within days, and the date lived only in someone's head.
What a YPA sheet looks like
Every notice goes onto the YPA Notices Register — one row per notice, both directions, with the deadline and the action.
YPA — Your Project Assistant · Notice Register
Example project · generated sheet format
| Notice No | Direction | Type | Subject | Date Issued | To / From | Evidence Ref | Deadline | Required Action | Status | Linked VO/RFI | Verified By | Source Tag |
|---|
| N-01 | 2026-04-16 | In | Instruction | Stone cladding – balcony change | Architect → You | email 16 Apr | 2026-04-21 | Confirm receipt | Responded | VO-06 | — | Email |
| N-02 | 2026-06-12 | In | Default notice | Aluminium window installation – alleged delay | Client → You | email 12 Jun | 2026-06-26 | Reply within window | Responded | — | — | Email |
| N-03 | 2026-06-25 | Out | Delay notification | Stormwater drawings late | You → Client | email 25 Jun | — | For the record | Sent | — | — | Email |
| N-04 | 2026-07-08 | Out | Extension of time request | Foundation delay – changed ground | You → Principal agent | letter 08 Jul | 2026-07-22 | EOT adjudication | Closed | VO-01 | — | Letter |
| N-05 | 2026-07-15 | In | Instruction – clarify | Stop work at boundary wall | Engineer → You | email 15 Jul | 2026-07-17 | Confirm receipt + position | Responded | VO-09 | — | Email |
| N-06 | 2026-07-28 | Out | Variation notice | Tiling – larger format, labour only | You → Principal agent | WhatsApp 28 Jul | 2026-09-12 | Price instruction | Sent | VO-07 | — | WhatsApp |
| N-07 | 2026-08-14 | In | Notice of default | Roofing programme – client concern | Client → You | letter 14 Aug | 2026-09-12 | Reply within window | Received | — | — | Letter |
| N-08 | 2026-08-20 | Out | Delay notification | Windows – revised sill height | You → Client | email 20 Aug | — | For the record | Sent | VO-03 | — | Email |
| N-09 | 2026-09-01 | Out | Extension of time request | Late information – balustrade fixing detail | You → Principal agent | email 01 Sep | 2026-09-15 | EOT adjudication | Sent | RFI-114 | — | Email |
| N-10 | 2026-09-04 | Out | Practical completion notice | Block A – PC claimed | You → Client | letter 04 Sep | 2026-09-18 | Client inspection | Draft | — | — | Letter |
4 windows open · next closes 2026-09-12YPA watches the response clocks in your morning brief →
Example only — illustrative rows in the real YPA Notice Register sheet format.
What you can do today
- When a notice lands, put it somewhere dated the same day — forward it, photograph it, or say it in a voice note. The window starts the day it's issued.
- When something on site first looks like it will delay you, say so the same day — the notice protects the position; the argument comes later.
- Write the deadline down twice — once in the diary, once where you'll see it before it passes.
- Keep the evidence with the notice — the window is only as good as the paper that proves it.
Want the full picture?
We've built YPA for the way African construction projects actually work. YPA is the site file with a memory. YPA is onboarding its first live builds in small, limited cohorts. Pilot places are free for a defined period — and if we ever charge, the plan and its price will be shown to you before anything is billed.